Services

Dirt work, start to finish

Grading, clearing, septic, demo, and pads. Same contractor. Same county.

Excavator grading a North Georgia lot

01 — Grading

Grading and excavation

Cut, fill, and finish grade for driveways, house pads, drainage swales, and access roads.

  • Rough and finish grade
  • Driveways and culverts
  • Cut-and-fill for building pads
  • Drainage ditches and slope work
Estimate this job
Timber and understory on a lot before forestry mulching

02 — Clearing

Land clearing and forestry mulching

Open a wooded lot without stripping it to moonscape unless that is what you asked for. Mulch in place or haul the brush. Good first step before grade and septic.

  • Forestry mulching
  • Brush and understory
  • Selective tree removal for a home site
  • Haul-off when mulch is not the plan
Estimate this job
Excavator and concrete tank on a septic installation

03 — Septic

Septic repair and installation

New tanks, failed lines, and field work. We dig, set, and backfill. County rules still apply — we work with the permit, not around it.

  • New septic install
  • Tank and line repair
  • Field excavation
  • Pump-out access and replacements
Estimate this job
Demolition interior with debris ready for haul-off

04 — Demo

Demolition and removal

Tear down what is in the way — old sheds, leftover houses, slabs, and junk structures — and get it off the lot so grade can start.

  • Residential tear-down
  • Outbuildings and barns
  • Foundation and slab removal
  • Debris haul-off
Estimate this job
Framed new construction on a prepared pad in North Georgia

05 — Site prep

Site preparation for new construction

Clear, grade, and pad so a builder can put a house on it. Access, drainage, and utility trenches included when the job calls for it. Site work for a new home can start here. Pride-Built Homes is the sister builder if you still need a house after the dirt is right.

  • House pads and garage pads
  • Builder access and staging
  • Utility and septic trenches
  • Final grade before pour or framing
Estimate this job